Available Corrigendum

 
 Search Corrigendum Back to tenders
 
  Unit Location  
Department  
  Opening Date       (DD/MM/YYYY)
 

 Please Click on the Tender No. to see more details. You must login to download the tenders.
New Users can
Register here.

 

 Tender No

  Description

 Issue Date  

Opening Date

Corrigendum

CE/CON/A-S/MB/2018/07

Balance work for constr uction of superstructure and erection of superstructure (Co mposite Girder) for 11 Nos. Major Bridges viz. Br. No. 255 at Km 78/009 (Span 1x18.30m), Br. No. 277 at Km 82/879 (span 2x18.30m), Br. No. 287 at Km 85/685 (span 1x18.30m), Br. No. 289 at Km 85/935 (span 1x18.30m), Br. No. 291 at Km 87/129 (span 1x18.30m), Br. No. 331 at Km 97/087 (span 1x18.30m), Br. No. 332 at Km 97/146 (span 1x18.30m), Br. No. 337 at Km 97/901 (span 2x18.30m), Br. No. 341 at Km 98/717 (span 1x18.30m), Br. No. 352 at Km 100/764 (span 1x18.30), Br. No. 377 at Km 107/218 (span 2x18.30m) on pile foundation and other ancillary works as per Railway approved drawing and specification for commissioning of Belonia - Sabroom section in connection with Agartala - Sabroom new BG Line project.

3/8/2018

17/8/2018 3:30:00 PM

1) 01
Dated: 18/7/2018

DyCE-CON-LINK-NJP-18-02

Linking of BG Track on PSC sleeper manually between Ch.34.33 Km to 46.40 Km including remodeling of New Domohani, New Maynaguri station yards and all other ancillary works in connection with BG doubling of Ambari Falakata to New Maynaguri section of N.F. Railway

25/7/2018

8/8/2018 4:00:00 PM

1) 01
Dated: 14/7/2018

CE/CON/A-S/MIS/2018/03

Balance work for Construction of RCC Retaining wall cum drain at the toe of cutting and filling, Surface drains, Longitudinal drain, Catch Water Drains,Cross Drain, Protection of slopes in Cutting and filling sections with turfing, geojute, construction of approach road to ROB's and RUB's, casting and erection of hectometre posts etc. and other balance ancillary works in between Km 93.00 to Km 103.00 for commissioning of section in connection with Agartala - Sabroom new BG Line project.

24/7/2018

7/8/2018 3:30:00 PM

1) 01
Dated: 28/6/2018

CE/CON/A-S/MIS/2018/04

Balance work for Construction of RCC Drain, RCC Retaining wall, Catch Water Drain, Side Drain, Toe wall, Protection of slope in Cutting and filling section of Railway bank with Geo-Jute and Turfing, Approach Road of RUB/LHS, casting and erection of Railway land Boundary post, Hectometer post etc. and other balance ancillary works in between Km 103.00 to Km 114.68 including miscellaneous works in Sabroom yard in connection with Agartala - Sabroom new BG Line project.

24/7/2018

7/8/2018 3:30:00 PM

1) 01
Dated: 28/6/2018

CE/CON/A-S/MIS/2018/02

Balance work for construction of RCC drain cum Retaining Wall, Catch water drain, Cross drain, toe wall, Protection of slopes in cutting and filling sections with Geo-jute and turfing, miscellaneous posts e.g. land boundary pillars, hectometre posts, kilometre posts and any other ancillary works in between Km 83.000 to 93.000 for commissioning of the section in connection with Agartala - Sabroom new BG Line project.

24/7/2018

7/8/2018 3:30:00 PM

1) 01
Dated: 28/6/2018

CE/CON/A-S/MIS/2018/01

Balance work for construction of RCC Drain cum Retaining wall, Catch Water Drain, Cross Drain, Toe wall, casting and erection of land boundary pillars, Hectometer posts, Kilometer posts and any other balance ancillary works in between Km 73.00 to Km 83.00 for commissioning of the section in connection with Agartala - Sabroom new BG Line project.

24/7/2018

7/8/2018 3:30:00 PM

1) 01
Dated: 28/6/2018

EL/CON/MLG /02/2018-2019/NBQ-via GLPT-KYQ(PD)

Electrification of station building, PP shed, platform lighting, FOB lighting, Passenger circulating area, goods circulating area and other service building etc. at NBQ, Majgaon, Abhayapuri, Joighopa,Pancharatna, Goalpara,Krishnai,Dudhnoi,Amjonga Railway station from NBQ-Via GLPT-KYQ under patch doubling project.

13/7/2018

17/8/2018 3:00:00 PM

1) 01
Dated: 20/7/2018

EL/CON/MLG/01/2018-19/NBQ-Via GLPT-KYQ (PD)

Modification of sub-station & power supply to station building, Quarters, other service building & provision of pump & illumination of colonies etc. at NBQ, Majgaon, Abhayapuri, Jogighopa, Pancharatna, Goalpara, Krishnai, Dudhnoi, Amjonga Railway station in between section for NBQ-Via GLPT-KYQ under patch doubling project.

13/7/2018

17/8/2018 3:00:00 PM

1) 01
Dated: 20/7/2018

EL/CON/MLG/03/2018-19/NBQ-Via GLPT-KYQ (PD)

Electrification of station building, PP shed, Platform lighting, FOB lighting, passenger circulating area, goods circulating area and other service building etc. at Rangijuli, Dhupdhara, Singra, Boko, Bamunigaon, Chhayagaon, Mirza, Azara Railway station from NBQ-Via GLPT-KYQ under patch doubling project.

10/7/2018

13/8/2018 3:00:00 PM

1) 01
Dated: 17/7/2018
2) 02
Dated: 17/7/2018

EL/CON/MLG/03/2018-19/NBQ-Via GLPT-KYQ (PD)

Electrification of station building, PP shed, Platform lighting, FOB lighting, passenger circulating area, goods circulating area and other service building etc. at Rangijuli, Dhupdhara, Singra, Boko, Bamunigaon, Chhayagaon, Mirza, Azara Railway station from NBQ-Via GLPT-KYQ under patch doubling project.

10/7/2018

13/8/2018 3:00:00 PM

1) 01
Dated: 17/7/2018
2) 02
Dated: 17/7/2018

EL/CON/MLG /07/2018-2019/NBQ-GLPT-KYQ

Provision of power supply & electrification of flash butt welding plant shop at New Bongaigaon

10/7/2018

13/8/2018 3:00:00 PM

1) 01
Dated: 17/7/2018
2) 02
Dated: 17/7/2018

EL/CON/MLG /07/2018-2019/NBQ-GLPT-KYQ

Provision of power supply & electrification of flash butt welding plant shop at New Bongaigaon

10/7/2018

13/8/2018 3:00:00 PM

1) 01
Dated: 17/7/2018
2) 02
Dated: 17/7/2018

EL/CON/HQ/07/2017-18/Bogibeel

Architectural lighting of Bogibeel Bridge

6/7/2018

2/8/2018 3:15:00 PM

1) 01
Dated: 19/7/2018

       

First : Previous [  1 ] Next : Last  

 