Back to Home Page

   
 

Available Tenders

 
 Search Tenders

View Store Tenders

Corrigendum

 
  Unit Location  
Department  
  Opening Date       (DD/MM/YYYY)  
  Tender No.
 

 Please Click on the Tender No. to see more details. You must login to download the tenders.
New Users can
Register here.

 

 Tender No

  Description

 Issue Date  

Receipt of Offer up to

Opening Date

Corrigendum

CE/CON/N-A/BLD/2021/03

At station - Rangiya Jn., Kendukona, Baihata, Changsari, Agthori & Ghograpar, construction of Station Building, High level Passanger Platform, PP Shed, Foot over bridge, other passanger amenities, circulating area, approach roads, staff quarters etc. etc. and other ancillary works in connection with double line work of New Bongaigaon - Agthori project.

29/06/2021

13/07/2021

13/07/2021 3:30:00 PM

Nil

CE/CON/B-S/EMB/2021/01

Balance earthwork in cutting to form formation and earthwork in filling to form embankment/subbank and construction of minor bridges, retaining walls, pucca approach roads to alignment and other ancillary works between Ch Km 8.00 to Km 12.00 and Br. No. 37 (3x24.40m span composite girder) at Ch. 13.831 Km, Construction of ROB No. 18 Km 6.1 (Span 1x8.7m RCC Box) including other ancillary works in between station Bairabi and Hortoki in connection with the construction of new BG Railway line from Bairabi to Sairang (Mizoram).

29/06/2021

13/07/2021

13/07/2021 3:30:00 PM

Nil

CE/CON/JI/EMB/2021/03

Balance work for Earthwork in cutting to form formation & in filling to form embankment including mechanical compaction, construction of Retaining wall, drain, nullah training & other ancillary work from KM 96.00 to KM 98.00 in between Noney to Tupul along with Balance work for Earthwork in cutting including hard rock to form formation & in filling to form embankment including mechanical compaction at Noney yard & Construction of Jdrain, Minor Br. No.164A, nullah training, U/S & D/S protection work of Br. No. 165 & other ancillary work at Noney yard from chainage 87.400 KM to 88.50 Km in connection with construction of new BG Line from Jiribam to Imphal

25/06/2021

09/07/2021

09/07/2021 3:30:00 PM

Nil

EL/CON/MLG/11/2020-21/MLG /RT

Up keeping of 2nos passenger elevator (OTIS) at GM/CON/MLG, N.F.Railway office building for a period of three ( 3 ) years ( say 1095 days).

10/06/2021

07/07/2021

07/07/2021 3:00:00 PM

Nil

CE/CON/N-A/TL/2021/01

Linking of BG track with 60kg single /long welded panels with 1660 nos. PSC sleeper per km in main line and 60kg /52kg single /three rails welded panels with 1540 nos. PSC sleeper per km in loop lines including linking of 1 in 12, 1 in 8.5 and derailing switches on PSC sleepers (Fan shaped layout), laying of SEJs etc.., dismantling of BG track, point & crossings from km 317/7-8 to 362/0-1 (Ch. 66250 to Ch. 110803) = 44.55 KM including RNY yard.

25/05/2021

29/06/2021

29/06/2021 3:30:00 PM

1) 01
Dated: 01/06/2021

EL/CON/MLG/02/2021-22/MLG

Electrification of G +5 administrative building at GM/CON complex Maligaon by provision of internal wiring , UPS system, lightening protection system submersible pump, Fire Hydrant system, Fire signage, integrated building management system, Fire alarm & public addressing system, lighting automation,80 KWP on Grid solar power plant etc. & provision of Heat, ventilation &air-conditioning system & provision of electrical Traction 2 Nos passenger and 1 No passenger cum goods elevators for G+5 administrative building &provision of LT power supply to G+5 administrative building from GM/CON power house by augmentation of existing sub-station , including installation of 2x630 KVA, 11/0.44 KV transformer with panel board etc.

28/05/2021

28/06/2021

28/06/2021 3:00:00 PM

Nil

CE/CON/J-T/MB/2021/02/RT-1

Balance work of Construction of foundation and substructure (including pile foundation, piers, abutment, bed block etc.) of Major Bridge No.164(Span 1x71.50m+5x106.00m+1x71.50m+1x30m Steel Girder )on river IRING at Km.86.996 including protection work in the approaches and other ancillary works in connection with construction of New BG Railway line from Jiribam-Tupul (Imphal) of N.F.Railway(Construction) in section khongsangNoney.

11/06/2021

25/06/2021

25/06/2021 3:30:00 PM

Nil

CE/CON/N-A/MB/2021/02

Earthwork in formation for making Railway embankment, construction of minor bridge, blanketing work as per RDSO's specification and construction of substructure and superstructure of Major bridges on pile foundation: Bridge No. 513 (6x12.2m PSC slab), 516 (5x12.2m PSC slab), 517 (2x9.15+3x6.1m PSC slab), 518 (2x12.2m PSC slab), 519 (2x12.2m PSC slab), 520 (3x6.10m PSC slab), 521 (4x30.5m OWT +2x6.1m PSC slab), 523 (2x9.15m PSC slab), 524 (1x12.2m PSC slab), 525 (9.15m+12.2m+9.15m PSC slab), 527 (3x12.2m PSC slab), 531 (3x12.2m PSC slab) and 532 (2x12.2m PSC slab) including steel girder launching of Bridge No. 521(4x30.5m OWT) and all ancillary works in between station Rangiya to Agthori Km 362/0 to Km 395/0 in connection with double line work of New Bongaigaon - Agthori project.

11/06/2021

25/06/2021

25/06/2021 3:30:00 PM

Nil

CE/CON/A-G/EMB/2021/05

Earthwork in filling to form embankment including blanketing, construction of minor bridges (10 Nos.), RUB (14 Nos.), trolley refuges, drain, protection work, approach road, diversion road, toe wall and other ancillary works from Ch. 39.10 Km to Ch. 49.60 Km between Bardha Halt and Kaliaganj Station excluding approaches of major bridges (50m both side) in connection with construction of new BG line from Arariya to Galgalia of N.F. Railway (Construction).

11/06/2021

25/06/2021

25/06/2021 3:30:00 PM

Nil

CE/CON/A-G/EMB/2021/04

Earthwork in filling to form embankment including blanketing, construction of minor bridges (15 Nos.), RUB (12 Nos.), trolley refuges, drain, protection work, approach road, diversion road, toe wall and other ancillary works from Ch. 26.00 Km to Ch. 38.40 Km between Lakxmipur and Bardha Halt excluding approaches of major bridges (50m both side) in connection with construction of new BG line from Arariya to Galgalia of N.F. Railway (Construction).

11/05/2021

20/06/2021

20/06/2021 3:30:00 PM

1) 01
Dated: 21/05/2021

CE/CON/D-K/TN/2021/04

Construction of Single line BG Tunnel No. 17, 18 & 19 (3 Nos Approximate total length 1460m) between Ch. 75500 to Ch. 80600 including Cut & cover, Earthwork in bank & cutting to make formation and other protection and ancillary works in connection with DMV-Kohima new BG Line Project.

13/04/2021

15/06/2021

15/06/2021 3:30:00 PM

1) 03
Dated: 27/05/2021
2) 02
Dated: 27/05/2021
3) 01
Dated: 27/05/2021

CE/CON/D-K/TN/2021/03

Construction of Single line BG Tunnel No. 13, 14, 15 & 16 (4 Nos Approximate total length 2960m) between Ch. 70160 to Ch. 75160 including Cut & cover, Earthwork in bank & cutting to make formation and other protection and ancillary works in connection with DMV-Kohima new BG Line Project.

13/04/2021

15/06/2021

15/06/2021 3:30:00 PM

1) 03
Dated: 27/05/2021
2) 02
Dated: 27/05/2021
3) 01
Dated: 27/05/2021

CE/CON/D-K/TN/2021/02

Construction of Single line BG Tunnel No. 11 & 12 (2 Nos Approximate total length 1120m) between Ch. 68700 to Ch. 69930 including Cut & cover, Earthwork in bank & cutting to make formation and other protection and ancillary works in connection with DMV-Kohima new BG Line Project.

13/04/2021

15/06/2021

15/06/2021 3:30:00 PM

1) 03
Dated: 27/05/2021
2) 02
Dated: 27/05/2021
3) 01
Dated: 27/05/2021

         

First : Previous [  1 ] Next : Last  

         
 

Powered by WebX