Back to Home Page

   
 

Available Tenders

 
 Search Tenders

View Store Tenders

Corrigendum

 
  Unit Location  
Department  
  Opening Date       (DD/MM/YYYY)  
  Tender No.
 

 Please Click on the Tender No. to see more details. You must login to download the tenders.
New Users can
Register here.

 

 Tender No

  Description

 Issue Date  

Receipt of Offer up to

Opening Date

Corrigendum

CE/CON/A-S/MIS/2018/01

Balance work for construction of RCC Drain cum Retaining wall, Catch Water Drain, Cross Drain, Toe wall, casting and erection of land boundary pillars, Hectometer posts, Kilometer posts and any other balance ancillary works in between Km 73.00 to Km 83.00 for commissioning of the section in connection with Agartala - Sabroom new BG Line project.

24/07/2018

07/08/2018

07/08/2018 3:30:00 PM

1) 01
Dated: 28/06/2018

CE/CON/A-S/MIS/2018/03

Balance work for Construction of RCC Retaining wall cum drain at the toe of cutting and filling, Surface drains, Longitudinal drain, Catch Water Drains,Cross Drain, Protection of slopes in Cutting and filling sections with turfing, geojute, construction of approach road to ROB's and RUB's, casting and erection of hectometre posts etc. and other balance ancillary works in between Km 93.00 to Km 103.00 for commissioning of section in connection with Agartala - Sabroom new BG Line project.

24/07/2018

07/08/2018

07/08/2018 3:30:00 PM

1) 01
Dated: 28/06/2018

CE/CON/A-S/MIS/2018/04

Balance work for Construction of RCC Drain, RCC Retaining wall, Catch Water Drain, Side Drain, Toe wall, Protection of slope in Cutting and filling section of Railway bank with Geo-Jute and Turfing, Approach Road of RUB/LHS, casting and erection of Railway land Boundary post, Hectometer post etc. and other balance ancillary works in between Km 103.00 to Km 114.68 including miscellaneous works in Sabroom yard in connection with Agartala - Sabroom new BG Line project.

24/07/2018

07/08/2018

07/08/2018 3:30:00 PM

1) 01
Dated: 28/06/2018

CE/CON/A-S/MIS/2018/02

Balance work for construction of RCC drain cum Retaining Wall, Catch water drain, Cross drain, toe wall, Protection of slopes in cutting and filling sections with Geo-jute and turfing, miscellaneous posts e.g. land boundary pillars, hectometre posts, kilometre posts and any other ancillary works in between Km 83.000 to 93.000 for commissioning of the section in connection with Agartala - Sabroom new BG Line project.

24/07/2018

07/08/2018

07/08/2018 3:30:00 PM

1) 01
Dated: 28/06/2018

Dy.CEE/CON/NJP/E/03/2018-19/NMX JPZ (NL)

Re-wiring & Re-cabling for 70% and 30% Lighting System through sinnal sensoring unit and load controller unit at Gauripur, Bilasipara, Chapor, Baithamari and Avayapuri Railway station in connection with NMX-JPZ Project.

30/06/2018

07/08/2018

07/08/2018 3:15:00 PM

Nil

CE/CON/B-S/BLD/2018/02

At Mualkhang Station: Construction of New 'B' class Station Building including development of station circulating area, passenger platform, FOB, PP shed, station boundary wall, approach road, retaining wall, one P. Way Godown, 2 location huts, 7 Blocks(7x4=28 units) Type-II quarters, 2 Blocks (2x4=8 unis) Type-III quarters at Mualkhang station and At Sairang Station: Construction of 16 Blocks (16x4=64 units)Type-II quarters, 6 Blocks (6x4=24 units) Type-III quarters, one Block (1x4=4 units) Type-IV quarters, 7 nos offices for ADEN & SSE's (P.way, Works, Signal, Telecom, Elect, Bridge), one Health Unit, one P.Way Godown, 2 location huts & one Security barrack at Sairang station including all other ancillary works in connection with Bairabi to Sairang New BG Railway Line Project.

20/07/2018

03/08/2018

03/08/2018 3:30:00 PM

Nil

CE/CON/J-T/PA/2018/02/RT1

Construction of Awangkhul Station Building including RBG room, passenger platform, PF Shelter, Location hut, Quarters, circulating area, approach road and other ancillary works in connection with construction of new BG Railway Line from Jiribam-Tupul (Imphal) Project.

20/07/2018

03/08/2018

03/08/2018 3:30:00 PM

Nil

CON-DL-JPZ-HV-01-RT-2018

Hiring of 2(two) Nos non AC light motor vehicles(Viz. Bolero/Scorpio / Tata sumu) for 2 years along with driver for use of Railway Officers under the jurisdiction of Deputy Chief Engineer Construction, Jogighopa/ DLP for entire N.F. Railway in connection with construction of NBO- GLP - KYQ Double Line Project.

19/07/2018

02/08/2018

03/08/2018 11:00:00 AM

Nil

EL/CON/HQ/07/2017-18/Bogibeel

Architectural lighting of Bogibeel Bridge

06/07/2018

02/08/2018

02/08/2018 3:15:00 PM

1) 01
Dated: 19/07/2018

         

First : Previous [  1 2 ] Next : Last  

         
 

Powered by WebX